USW were detailed to be involved in our long standing client, Meta’s, 730,000sq.ft addition of the HQ campus, at the Farley Building. USW provided a “Turn-key” Atrium and Lobby Stair Monumental stairs. Included in this scope was the design, fabrication and installation of not only the Steel but also the USW also engaged with other trusted partners to provide the millwork, treads and painting to provide the total package for one of our top clients. In addition, USW provided structural and misc steel for Cool Towers and finished egressed railings for the amenity floors. This project also allowed USW the opportunity with cred Meta Arts Team with the installation of “Sacred Footprint” , a very special and unique project in itself.